
High-Density AI Colocation
WHERE POWER BECOMES INTELLIGENCE.
BUILT FORHIGH-DENSITY COMPUTE.
57°N is a 15 MW high-density AI colocation campus being developed in Ventspils, Latvia, with phased capacity delivery from early 2028.
CAPACITY DELIVERY- 2.5 MW
- FIRST CAPACITY
- 10 MW
- EXPANSION
- 15 MW
- PLANNED CAPACITY
TOTAL FACILITY CAPACITY · PHASED DELIVERY FROM EARLY 2028
PROJECT PARAMETERS- UP TO250 kW
- PER RACK
- 1.2
- DESIGNED PUE
- LIQUID
- COOLING
- 100%
- RENEWABLE ENERGY
Designed for GPU-intensive AI, HPC and accelerated compute deployments, 57°N combines phased capacity delivery with infrastructure designed to support high-density requirements at scale.
ENGINEERED FORAI AT SCALE.
57°N is being designed for GPU-intensive AI, HPC and accelerated computing — combining high-density power delivery, liquid cooling, resilient connectivity and infrastructure engineered for long-term scale.
DESIGNED AROUNDYOUR DEPLOYMENT.
57°N is currently in development, creating an opportunity for early capacity partners to align selected infrastructure parameters with deployment-specific requirements.

POWER
HIGH-DENSITY POWER DELIVERY
Power architecture is being developed around the requirements of high-density AI and accelerated compute infrastructure.
COOLING
LIQUID COOLING
UP TO 250 kW / RACK
Cooling infrastructure is being designed for the thermal demands of GPU-intensive AI, HPC and accelerated compute deployments.
CONNECTIVITY
OPTICAL FIBRE CONNECTIVITY
57°N is being developed with international optical connectivity as a core part of the infrastructure strategy.
RESILIENCE & SECURITY
RESILIENCE BY DESIGN
Infrastructure resilience and physical security are being incorporated into the campus design from the development stage.
SAFETY & COMPLIANCE
PROTECTION BY DESIGN
Fire protection, operational safety and compliance requirements are being integrated into the technical design of the facility.
POWER IS THEFOUNDATION.
High-density AI infrastructure is ultimately constrained by power.
57°N is being developed with energy at the core of the project — with a 100% renewable energy strategy based on solar and wind.
100% RENEWABLE ENERGY · SOLAR · WIND


BUILT WHEREINFRASTRUCTURECONNECTS.
57°N is being developed in Ventspils, Latvia — a Northern European location where power, international fibre connectivity and long-term infrastructure capacity converge.
The location is part of the infrastructure strategy.
- OPTICAL FIBRE
- CONNECTIVITY
- International optical connectivity from Ventspils, complemented by terrestrial fibre routes.
- 110 / 330 kV
- POWER INFRASTRUCTURE
- Established high-voltage transmission infrastructure serving the Ventspils region.
- 57° NORTH
- NORTHERN EUROPE
- A Northern European operating environment supporting the infrastructure strategy of the campus.
- 15 MW
- DEVELOPMENT HORIZON
- Planned total facility capacity by 2029.
BUILT AT
57° NORTH.
VENTSPILS · LATVIA · NORTHERN EUROPE
START ACONVERSATION.
Capacity discussions are open for organisations planning high-density AI and accelerated compute deployments in Northern Europe.
FIRST CAPACITY · 2.5 MW · EARLY 2028